Your browser is out of date.

You are currently using Internet Explorer 7/8/9, which is not supported by our site. For the best experience, please use one of the latest browsers.

Emergency Factory Assist & Die Stamping

Superior- We’re here when you need us most. When our customers need that rapid response, they know that can trust Superior to get the job done with what they need, when they need it.

Learn More
Employees working on factory assist order.

Our Emergency Capabilities

With our emergency factory assist capabilities, typically, we can turn your dies and material around in 36 hours from receipt. With 2 shifts and 2 facilities, we can accommodate almost every requirement, large or small, 24/7 when you need it. Talk to one of our Superior Representatives to find out if we can be your emergency die & stamping department when you need one. Experience Superior results.

To ensure that your requirements are processed effectively and efficiently, we have embedded our process in our work instructions tied to our ISO document as time is your most valuable resource when your press is down.

Contact for an Emergency

Superior's Emergency Factory Assist Support - When You Need a Partner

Total time to your parts to arrive 27 to 112 hours, of 5 days total start to finish

Obtaining your information on what you need and when

Superior determines how your parts can be run at our facility

Your dies, raw material, containers, quality fixtures, operations samples for quality assurance and inspection sheet to transit to Superior

Die, Raw Material, process layout are set in press line and 30 piece run is completed to ensure all quality feature are compliant with Operational samples sent

  1. Initial production run is started and 1st shipment of your parts are inspected and packed in your containers
  2. Parts arrive as your plant is ready for production

Emergency Assist Timeline

Task #1: Receive Customer Die/Process information.

Purpose: To obtain customer information listed below either on the attached form or in customer’s in-house format. 

  • Part name and number
  • Die Lineup and Shut Heights
  • All die dimensions
  • Special die functions, delays, changeover, pierce nut
  • Air pin patten, size and above bolster
  • Material specifications
  • Tonnage requirements
  • Number of dies
  • Immediate pieces required with drop dead date
  • Length of assist time
  • Weekly volume
  • Lube information
  • Inspection criteria
  • Die weights
  • Quality / Product contact phone # / email
  • Tooling contact phone # / email
  • Material contact phone # / email
  • Packaging and container information
  • Ship to Location
  • Inspection history or run studies, etc.
  • GD&T, Material tolerances
  • Tooling spare parts (perishables)
  • Fixture operating procedures (Roadmap)
  • Sample parts
  • Operational panels (if available)
  • Math data
Request a Consultation

Task #2: Feasibility 

Purpose: Determine Feasibility of Assistance

When information has been received, SDT will evaluate and determine if SDT is capable of assisting in production. If yes, the tools and all necessary peripherals will be transported to Superior’s facility by our customers.

Request a Consultation

Task #3: Items to be Transported:

Purpose: To obtain all items needed for production.   

  • Dies
  • Packing racks / Shipping rack or container
  • Material
  • Spare sections / punches / buttons (if available)
  • Checking fixtures
  • Special bullrings, risers, plates necessary for production
  • Current operational panels or a boundary sample
  • Current inspection sheets with exceptions noted or inspection instructions
Request a Consultation

Task #4: Setup

Purpose: Setup tools and produce first piece for production approval.

  • Set dies in their respective presses
  • Run (30) pieces to verify part to fixture or sample
  • Do dimensional layout on one part
  • Report layout findings to QA contact by fax / email.
  • Customer signs off on Part Submission Warrant
Request a Consultation

Task #5: Production Starts

Purpose: Run initial part quantity, pack and ship to production facility- Run rates depend on process and complexity of operations by normally range between 150 to 250 pph.

Request a Consultation

Milestone: Product arrives at customer plant

Ship first 500 to 1000 parts to customers plant. Depending upon the distance, 1st shipments often leave our plants within 48 to 72 hours

Contacts - Time Frame - Cell Phone

  • Fred Hoyle - Engineering - 8:00am-5:00pm EST - 614-570-3050
  • Jim Middleton - Plant Manager  - 6:00am-5:00pm EST -  614-309-5823
  • Tony Stockton  - Plant Manager- 7:00am-5:00pm EST -  614-563-4892
  • Buddy Minnard - Prod Control - 7:00am-5:00pm EST - 614-560-6437
  • Brian Osborn - Nights Manuf Mgr- 2:30pm-Midnight EST- 740-644-3964
  • Keith Arbaugh - Nights Manuf Mgr- 2:30pm-Midnight EST- 614-586-6411
  • Paul Hook - VP - 24 Hours - 614-395-9005
  • Michael Bonczak - Commercial - 24 Hours - 937-419-9062
Request a Consultation
Ready to get started?

Tell us about your project and our experts will deliver a custom Superior Solution to meet your business needs.

The Superior Choice.

From concept through finished product, The Superior Die, Tool & Machine Company has the equipment and capabilities to produce and deliver quality products on-time at a competitive price.

Ask Our Experts.

Since 1913, our company has prided ourselves in exceeding our customers’ needs.

Ask us a question and one of our experienced team members will contact you within 24 hours.

For General Inquiries, call:
614-444-2181

For 24/7 Emergency Assist Items:

Call for Emergency Assist